Advance Search
Volume 36 Issue 4
Feb.  2025
Turn off MathJax
Article Contents
Wang Zhongqiu, Wu Qi, Zhang Yunbo, Liu Le. Strategies of Factory Tests of Safety Digital Instrumentation and Control System in Nuclear Power Plants[J]. Nuclear Power Engineering, 2015, 36(4): 79-82. doi: 10.13832/j.jnpe.2015.04.0079
Citation: Wang Zhongqiu, Wu Qi, Zhang Yunbo, Liu Le. Strategies of Factory Tests of Safety Digital Instrumentation and Control System in Nuclear Power Plants[J]. Nuclear Power Engineering, 2015, 36(4): 79-82. doi: 10.13832/j.jnpe.2015.04.0079

Strategies of Factory Tests of Safety Digital Instrumentation and Control System in Nuclear Power Plants

doi: 10.13832/j.jnpe.2015.04.0079
  • Received Date: 2014-11-18
  • Rev Recd Date: 2015-05-14
  • Available Online: 2025-02-15
  • Combining the domestic practice and the experiences in the nuclear safety review of the factory tests(FT) of the safety digital instrument and control system(DCS), DCS FT is identified as several stages according to nuclear safety regulations and standards. The results show that the safety DCS function and performance should be tested. FOAK test strategy should be used discreetly, and not suggested to be used for the first system.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (22) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return