Advance Search
Volume 36 Issue S1
Feb.  2025
Turn off MathJax
Article Contents
Wang Yonggang, Xiang Wenxin, Yao Bo, Lyu Yunjiang. CEPR Core Design and Fuel Management in Taishan Nuclear Power Plant[J]. Nuclear Power Engineering, 2015, 36(S1): 51-53. doi: 10.13832/j.jnpe.2015.S1.0051
Citation: Wang Yonggang, Xiang Wenxin, Yao Bo, Lyu Yunjiang. CEPR Core Design and Fuel Management in Taishan Nuclear Power Plant[J]. Nuclear Power Engineering, 2015, 36(S1): 51-53. doi: 10.13832/j.jnpe.2015.S1.0051

CEPR Core Design and Fuel Management in Taishan Nuclear Power Plant

doi: 10.13832/j.jnpe.2015.S1.0051
  • Received Date: 2015-05-04
  • Rev Recd Date: 2015-07-20
  • Available Online: 2025-02-15
  • Taishan nuclear power plant(TNPS) has adopted CEPR technology, the 3rdgeneration PWR. Larger core scale provides lower linear power density and higher neutron economy. Mode T used in the control rods can improve the efficiency and reduce the wear of control rods. Using enriched boron optimizes the coolant chemistry. 18-month fuel management is introduced from the initial core. This feature improves the fuel economy in maximum.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (25) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return