Wang Changzheng. Commissioning of Main Feed Water Control Valves after Replacement[J]. Nuclear Power Engineering, 2015, 36(S1): 114-117. doi: 10.13832/j.jnpe.2015.S1.0114
Citation:
Wang Changzheng. Commissioning of Main Feed Water Control Valves after Replacement[J]. Nuclear Power Engineering, 2015, 36(S1): 114-117. doi: 10.13832/j.jnpe.2015.S1.0114
Wang Changzheng. Commissioning of Main Feed Water Control Valves after Replacement[J]. Nuclear Power Engineering, 2015, 36(S1): 114-117. doi: 10.13832/j.jnpe.2015.S1.0114
Citation:
Wang Changzheng. Commissioning of Main Feed Water Control Valves after Replacement[J]. Nuclear Power Engineering, 2015, 36(S1): 114-117. doi: 10.13832/j.jnpe.2015.S1.0114
This essay introduces commissioning tests after replacement of main feed water control valve of operating unit, analyzes risks of commissioning tests and provides counter-measures. It also mainly stresses problems emerged from commissioning tests of main feed water control valve as well as their treatment.