Advance Search
Volume 38 Issue 1
Feb.  2025
Turn off MathJax
Article Contents
Zhang Jin, Wan Zhijian, Li Jiakang, Dong Yiling, Deng Xiaoyun, Liu Pan. Analysis of PSI Defect Problem of CPR1000 Reactor Pressure Vessel[J]. Nuclear Power Engineering, 2017, 38(1): 99-103. doi: 10.13832/j.jnpe.2017.01.0099
Citation: Zhang Jin, Wan Zhijian, Li Jiakang, Dong Yiling, Deng Xiaoyun, Liu Pan. Analysis of PSI Defect Problem of CPR1000 Reactor Pressure Vessel[J]. Nuclear Power Engineering, 2017, 38(1): 99-103. doi: 10.13832/j.jnpe.2017.01.0099

Analysis of PSI Defect Problem of CPR1000 Reactor Pressure Vessel

doi: 10.13832/j.jnpe.2017.01.0099
  • Received Date: 2016-03-21
  • Rev Recd Date: 2016-08-15
  • Available Online: 2025-02-09
  • During the pre-service inspection of a certain CPR1000 reactor pressure vessel(RPV),unacceptable defect is found in the weld between outlet nozzle and flange-nozzle shell which complies with the requirements of ultrasonic testing(UT) during manufacturing.To solve the problem,the comparison of UT technique employed during manufacturing and PSI has been demonstrated.It is proved that the immediate cause of problem is that the acceptance criteria of manufacture according to RCC-M code has been applied to UT technique of PSI,and the root cause is the differences of the sizing method and the grouping requirements for defects between manufacturing and PSI.On account of PSI is intended to act as a zero point for in-service inspection,the view point is presented that unacceptable defects found during PSI,if possible,should be re-examined and accepted in accordance with the testing method and acceptance criteria of manufacturing.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (20) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return