The composing of the reactor protection system response time was introduced firstly. Considering the complex and difficulty of the test of RPS response time, and high requirement of test theory, two test schemes of all path converge test and all module converge test were introduced. The advantages and disadvantages of two schemes were analyzed. Through three tests during the outage in Fuqing Nuclear Power Plant, the feasibility of the test was proved.