Zhang Yulong, Li Yanglong. Analysis and Design of Solved Method on Main Feed Water Regulating Valve Frequent Fault of Qinshan 2th Nuclear Power Plant[J]. Nuclear Power Engineering, 2017, 38(6): 117-121. doi: 10.13832/j.jnpe.2017.06.0117
Citation:
Zhang Yulong, Li Yanglong. Analysis and Design of Solved Method on Main Feed Water Regulating Valve Frequent Fault of Qinshan 2th Nuclear Power Plant[J]. Nuclear Power Engineering, 2017, 38(6): 117-121. doi: 10.13832/j.jnpe.2017.06.0117
Zhang Yulong, Li Yanglong. Analysis and Design of Solved Method on Main Feed Water Regulating Valve Frequent Fault of Qinshan 2th Nuclear Power Plant[J]. Nuclear Power Engineering, 2017, 38(6): 117-121. doi: 10.13832/j.jnpe.2017.06.0117
Citation:
Zhang Yulong, Li Yanglong. Analysis and Design of Solved Method on Main Feed Water Regulating Valve Frequent Fault of Qinshan 2th Nuclear Power Plant[J]. Nuclear Power Engineering, 2017, 38(6): 117-121. doi: 10.13832/j.jnpe.2017.06.0117
The fault of main feed water regulating valve of CP600 nuclear power units occurs frequently. This paper analyzes several fault conditions frequently occurred on main feed water regulating valves, and studies the stuck of the main feed water regulating valve of CP600 simulator. Three control schemes are compared and the optimal control scheme for the hot standby condition is proposed.