Advance Search
Volume 38 Issue 6
Feb.  2025
Turn off MathJax
Article Contents
Wang Haoyu, Pu Zengping, Zhu Fawen, Chen Ping, Gu Mingfei, Liu Yanghua. Simulation and Analysis of New-Type Fuel Assembly Top Connection Structure[J]. Nuclear Power Engineering, 2017, 38(6): 163-166. doi: 10.13832/j.jnpe.2017.06.0163
Citation: Wang Haoyu, Pu Zengping, Zhu Fawen, Chen Ping, Gu Mingfei, Liu Yanghua. Simulation and Analysis of New-Type Fuel Assembly Top Connection Structure[J]. Nuclear Power Engineering, 2017, 38(6): 163-166. doi: 10.13832/j.jnpe.2017.06.0163

Simulation and Analysis of New-Type Fuel Assembly Top Connection Structure

doi: 10.13832/j.jnpe.2017.06.0163
  • Received Date: 2017-06-10
  • Rev Recd Date: 2017-09-30
  • Available Online: 2025-02-09
  • The function of fuel assembly top connection is to provide structure continuity and ensure the structure stability of fuel assemblies, so it plays an important role in the safety and performance of fuel assemblies. In order to analyze and evaluate a new-type fuel assembly top connection structure, considering contact nonlinear, material nonlinear and large deformation, a numerical simulation model is established in this paper by using ABAQUS. By comparison of the simulation result and the experimental result, the established finite element model is considered to be reasonable, and can be used to analyze and evaluate this new-type top connection structure. Finally, the tensile process of the top connection is analyzed in detail, and it is concluded that the friction force is the key factor for its tensile capacity.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (23) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return