Sun Zhan, Jiang Pingping, Zhang Wenguang, Jia Yanbo, Li Jiuzhen. Equipment Design and Management for First Unit of HPR1000[J]. Nuclear Power Engineering, 2018, 39(4): 148-151. doi: 10.13832/j.jnpe.2018.04.0148
Citation:
Sun Zhan, Jiang Pingping, Zhang Wenguang, Jia Yanbo, Li Jiuzhen. Equipment Design and Management for First Unit of HPR1000[J]. Nuclear Power Engineering, 2018, 39(4): 148-151. doi: 10.13832/j.jnpe.2018.04.0148
Sun Zhan, Jiang Pingping, Zhang Wenguang, Jia Yanbo, Li Jiuzhen. Equipment Design and Management for First Unit of HPR1000[J]. Nuclear Power Engineering, 2018, 39(4): 148-151. doi: 10.13832/j.jnpe.2018.04.0148
Citation:
Sun Zhan, Jiang Pingping, Zhang Wenguang, Jia Yanbo, Li Jiuzhen. Equipment Design and Management for First Unit of HPR1000[J]. Nuclear Power Engineering, 2018, 39(4): 148-151. doi: 10.13832/j.jnpe.2018.04.0148
In the engineering design and management of the first unit of HPR1000, the design plan, the management method integrating the design planning, design interface and design procurement are adopted. Through the implementation of the opening items, risk management and other innovative mechanisms, each equipment design task is completed on schedule, to guarantee that the construction of the first unit of HPR1000 is on schedule.