Xiang Hongyi, Liu yang, Huang Zhenguang, Chen Jiancai, Chen Kailin. Analysis of R Bank Frequent Action Problem in Yangjiang Nuclear Power Plant[J]. Nuclear Power Engineering, 2019, 40(1): 97-100. doi: 10.13832/j.jnpe.2019.01.0097
Citation: Xiang Hongyi, Liu yang, Huang Zhenguang, Chen Jiancai, Chen Kailin. Analysis of R Bank Frequent Action Problem in Yangjiang Nuclear Power Plant[J]. Nuclear Power Engineering, 2019, 40(1): 97-100. doi: 10.13832/j.jnpe.2019.01.0097

Analysis of R Bank Frequent Action Problem in Yangjiang Nuclear Power Plant

doi: 10.13832/j.jnpe.2019.01.0097
  • Publish Date: 2019-02-15
  • In the 2nd and 3rd nuclear fuel cycles of Unit 1,Unit 2 and Unit 3 in Yangjiang Nuclear Power Plant, , R bank acts frequently, seriously affecting the safety with operation of the unit. In this paper, the logic control principle of R bank and the loading of core are analyzed, and the transfer function of first-order inertia, lead lag and differential link is converted into difference equation. The theoretical calculation is carried out before the parameter is modified, and the temperature ±4℃ disturbance simulation test upon 87%FP power platform is carried out on the plant simulator. The test results show that the modified parameters are correct and can solve the frequent action problem of R bank. After the modification of the parameters for Unit 2, the R bank acts normally, and R bank action frequency is about 1 time per 2 days.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (191) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return