Advance Search
Volume 40 Issue 3
Jun.  2019
Turn off MathJax
Article Contents
Gao Yingxian, Zhang Hang, Qiu Zhifang, Liu Zhaodong, Li Meifu, Zeng Wei. Research of ECCS Scheme for Small Modular PWR Based on Combination of Deterministic and Probabilistic Methods[J]. Nuclear Power Engineering, 2019, 40(3): 175-179. doi: 10.13832/j.jnpe.2019.03.0175
Citation: Gao Yingxian, Zhang Hang, Qiu Zhifang, Liu Zhaodong, Li Meifu, Zeng Wei. Research of ECCS Scheme for Small Modular PWR Based on Combination of Deterministic and Probabilistic Methods[J]. Nuclear Power Engineering, 2019, 40(3): 175-179. doi: 10.13832/j.jnpe.2019.03.0175

Research of ECCS Scheme for Small Modular PWR Based on Combination of Deterministic and Probabilistic Methods

doi: 10.13832/j.jnpe.2019.03.0175
  • Publish Date: 2019-06-15
  •  In this study, based on the design characteristics of the small modular PWR, the emergency core cooling system (ECCS) scheme was analyzed for accident cases by applying the deterministic and probabilistic methods. The primary analysis shows that there is quite different requirement for the system scheme of the accumulator by deterministic and probabilistic methods. When the safety goal is ensured, it is suggested to eliminate the safety class accumulators (ACC) for ECCS simplification and other existing source water, such as IRWST in residual remove system, can be used after CMT failure.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (755) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return