Zhang Jiajia, Deng Wei, Xiao Jun, Gong Yu. Study on Function Extension of Pressurizer Fast Depressurization System for Gen Ⅲ PWR NPPs[J]. Nuclear Power Engineering, 2021, 42(5): 162-166. doi: 10.13832/j.jnpe.2021.05.0162
Citation: Zhang Jiajia, Deng Wei, Xiao Jun, Gong Yu. Study on Function Extension of Pressurizer Fast Depressurization System for Gen Ⅲ PWR NPPs[J]. Nuclear Power Engineering, 2021, 42(5): 162-166. doi: 10.13832/j.jnpe.2021.05.0162

Study on Function Extension of Pressurizer Fast Depressurization System for Gen Ⅲ PWR NPPs

doi: 10.13832/j.jnpe.2021.05.0162
  • Received Date: 2020-08-10
  • Rev Recd Date: 2020-09-17
  • Available Online: 2021-09-30
  • Publish Date: 2021-09-30
  • A nuclear power plant of Gen Ⅲ pressurized water reactor (PWR) in China has installed the pressurizer fast depressurization system for fast depressurization of the primary loop under severe accidents. With respect to this NPP, according to the general method and process of applying the probabilistic safety assessment (PSA) to the NPP design improvement, this study, focusing on the improvement plan of extending the pressurizer fast depressurization system function to the primary feed & bleed for depressurization to enable the use of this system as a standby pressure relief measure for the pressurizer safety valve, performs the PSA modeling and the feasibility evaluation and demonstration. Finally, this study shows that the improvement plan can reduce the core damage frequency of a NPP greatly, without any new negative effect, so the plan is feasible and can be implemented. Consequently, the NPPs should fully tap the potential of existing system equipment to further improve the safety and economical efficiency of NPPs.

     

  • loading
  • [1]
    陈钟钧. 稳压器快速卸压阀(截止阀)的功能特性研究[D]. 甘肃: 兰州理工大学, 2017.
    [2]
    XING J, SONG D Y, WU Y X. HPR1000: advanced pressurized water reactor with active and passive safety[J]. Engineering, 2016, 2(1): 79-87. doi: 10.1016/J.ENG.2016.01.017
    [3]
    邢继. 华龙一号能动与非能动相结合的先进压水堆核电厂[M]. 北京: 中国原子能出版社, 2016:140-142.
    [4]
    刘萍萍,张宁. 概率安全评价在CPR1000机组严重事故预防与缓解措施分析中的应用[J]. 原子能科学技术,2011, 45(4): 430-435.
    [5]
    张佳佳,倪曼,肖军,等. 二级PSA在严重事故管理中的应用研究[J]. 核动力工程,2020, 41(5): 74-78.
    [6]
    EIDE S A, WIERMAN T E, GENTILLON C D, et al. Industry average performance for components and initiating events at U. S. commercial nuclear power plants: NUREG/CR—6928[R]. Washington, D.C.: U.S Nuclear Regulatory Commission, 2007.
    [7]
    Nuclear Regulatory Commission. Common -cause failure parameter estimations, 2012 Update: NUREG /CR—5497[R]. Washington, D.C.: U.S. Nuclear Regulatory Commission, 2012.
    [8]
    GERMAN D, BLACKMAN H, MARBLE J, et al. The SPAR-H human reliability analysis method: NUREG/ CR—6883[R]. Washington, D.C.: U.S. Nuclear Regulatory Commission, 2005.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(3)  / Tables(5)

    Article Metrics

    Article views (306) PDF downloads(32) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return