Citation: | Chang Yuan, Shi Xueyao, Wang Henan, Wang Hui. Uncertainty Analysis and Application of Source Term under Bypass Release Accident of HPR1000[J]. Nuclear Power Engineering, 2022, 43(5): 70-75. doi: 10.13832/j.jnpe.2022.05.0070 |
[1] |
MATTIE P, GAUNTT R, ROSS K, et al. Uncertainty analysis of the unmitigated long-term station blackout of the peach bottom atomic power station[R]. Washington: U. S. Nuclear Regulatory Commission, 2016.
|
[2] |
ROSS K, BIXLER N, WEBER S, et al. Uncertainty analysis of the unmitigated short-term station blackout of the Surry power station[R]. Draft Report, 2016.
|
[3] |
GAUNTT R O, BIXLER N E, WAGNER K C. An uncertainty analysis of the hydrogen source term for a station blackout accident in Sequoyah using MELCOR 1.8. 5[R]. Albuquerque: Sandia National Lab. , 2014.
|
[4] |
TIBORCZ L, HOLLANDS T. Uncertainty and sensitivity analysis of the Phébus FPT3 test[J]. Nuclear Engineering and Design, 2021, 380: 111315. doi: 10.1016/j.nucengdes.2021.111315
|
[5] |
PARK S, AHN K I, SONG Y M, et al. Uncertainty analysis of the potential hazard of MCCI during severe accidents for the CANDU6 plant[J]. Science and Technology of Nuclear Installations, 2015, 2015: 462941.
|
[6] |
郎明刚,高祖瑛. 压水堆部分堆芯参数敏感性分析[J]. 核科学与工程,2002, 22(2): 104-107. doi: 10.3321/j.issn:0258-0918.2002.02.002
|
[7] |
郭连城,曹学武. 核电厂大LOCA始发严重事故下氢气源项的敏感性分析[J]. 核动力工程,2007, 28(5): 69-74,108. doi: 10.3969/j.issn.0258-0926.2007.05.016
|
[8] |
张亮,黄庆勇,张琪彬,等. MACCS估算反应堆严重事故后果的不确定度分析[J]. 核动力工程,2016, 37(S1): 93-95.
|
[9] |
冉旭,吴丹,陈炳德,等. 最佳估算加不确定性分析方法及其应用研究[J]. 核动力工程,2013, 34(3): 120-123. doi: 10.3969/j.issn.0258-0926.2013.03.027
|