Citation: | He Feng, Wu Wanjun, Ma Ruoqun, Fang Yonggang, Ai Honglei, Wang Xinjun, Sun Yingxue. Verification and Research of LBB Pipe Crack Leakage Rate Calculation Software PICLES[J]. Nuclear Power Engineering, 2022, 43(6): 168-173. doi: 10.13832/j.jnpe.2022.06.0168 |
[1] |
周胜,张征明. 破前漏分析中泄漏率模型研究进展[J]. 原子能科学技术,2009, 43(S1): 84-91.
|
[2] |
NORRIS D M, CHEXAL B. PICEP: pipe crack evaluation program (Revision 1): special report: EPRI-NP-3596-SR-Rev. 1[R]. Palo Alto: EPRI, 1987.
|
[3] |
PAUL D D, AHMAD J, SCOTT P M, et al. Evaluation and refinement of leak-rate estimation models: NUREG/CR-5128[R]. Washington: Nuclear Regulatory Commission, 1991.
|
[4] |
吴万军,谢海,兰彬,等. 管道裂纹泄漏率计算软件开发[J]. 核动力工程,2015, 36(4): 65-68. doi: 10.13832/j.jnpe.2015.04.0065
|
[5] |
彭常宏,郭赟,李浩,等. 管道穿透裂纹泄漏率计算程序[J]. 核动力工程,2003, 24(6): 505-507,554. doi: 10.3969/j.issn.0258-0926.2003.06.003
|
[6] |
U. S. Nuclear Regulatory Commission. Standard review plan 3.9. 1 special topics for mechanical components: NUREG-0800[S]. Washington: U. S. Nuclear Regulatory Commission, 2007.
|
[7] |
U. S. Nuclear Regulatory Commission. Evaluation of potential for pipe breaks: NUREG-1061[S]. Washington: U. S. Nuclear Regulatory Commission, 1984.
|
[8] |
U. S. Nuclear Regulatory Commission. Standard review plan 3.6. 3 Leak-before-break evaluation procedures: NUREG-0800[S]. Washington: U. S. Nuclear Regulatory Commission, 2007.
|
[9] |
吴万军,黄旋,沈平川. 管道裂纹泄漏率计算方法研究[J]. 核动力工程,2015, 36(S2): 122-126. doi: 10.13832/j.jnpe.2015.S2.0122
|