Zhang Feng, Qin Junwei, Xie Honghu, Liu Xiaohua, Chen Zhao, Yang Jinchun. Design and Analysis of Personnel Airlock New Transmission Mechanism Development for Nuclear Power Plant[J]. Nuclear Power Engineering, 2022, 43(6): 195-200. doi: 10.13832/j.jnpe.2022.06.0195
Citation: Zhang Feng, Qin Junwei, Xie Honghu, Liu Xiaohua, Chen Zhao, Yang Jinchun. Design and Analysis of Personnel Airlock New Transmission Mechanism Development for Nuclear Power Plant[J]. Nuclear Power Engineering, 2022, 43(6): 195-200. doi: 10.13832/j.jnpe.2022.06.0195

Design and Analysis of Personnel Airlock New Transmission Mechanism Development for Nuclear Power Plant

doi: 10.13832/j.jnpe.2022.06.0195
  • Received Date: 2021-11-19
  • Rev Recd Date: 2022-05-06
  • Publish Date: 2022-12-14
  • Using digital design method, a new transmission mechanism of personnel airlock is developed and the prototype modular design is completed. Using FMEA (failure mode and effects analysis) method, the weak links of the new transmission mechanism are found out, that is, the transmission chain of the locking mechanism, the door swing module and the bolt plug-in module after the earthquake. Respectively, using ADAMS dynamic simulation analysis software, the locking function and motion performance of the locking mechanism transmission chain are simulated and analyzed. Using ABAQUS finite element analysis software, the operability of the door swing module and the effectiveness of the bolt plug-in module after earthquake are analyzed. The results show that the transmission chain of the locking mechanism is properly selected, the door swing module meets the operational requirements, and the bolt plug-in module meets the effectiveness requirements. The transmission chain and structure of the new transmission mechanism developed are reasonable and meet the requirements of the third generation nuclear power.

     

  • loading
  • [1]
    沈勇坚,胡士光,徐道平,等. 核电厂人员闸门传动装置的设计[J]. 机械工程师,2015, 7: 224-246. doi: 10.3969/j.issn.1002-2333.2015.08.100
    [2]
    刘玉梅,赖斌生,倪立航,等. 福清核电人员闸门常见故障处理[J]. 科技传播,2016, 6: 219-220.
    [3]
    马贤德,梁聪聪,廖亮. 人员闸门在福清核电的应用和问题分析[J]. 科技传播,2016, 9: 187-188.
    [4]
    谢洪虎,马文勤,张峰,等. 核电厂人员闸门数字样机应用技术研究[J]. 核动力工程,2019, 40(4): 139-144.
    [5]
    刘华,陈柯,黄奇. FMEA在核电行业的应用评述[J]. 自动化博览,2015, 9: 88-90. doi: 10.3969/j.issn.1003-0492.2015.08.038
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(12)  / Tables(4)

    Article Metrics

    Article views (212) PDF downloads(24) Cited by()