Citation: | Pu Xiaobin, Ma Jun, Zhou Jianhua, Chen Ziming, Lu Peifang, Xie Rui. Main Control Room Renewal Technology Research & Planning of Qinshan Nuclear Power Plant[J]. Nuclear Power Engineering, 2022, 43(S1): 44-50. doi: 10.13832/j.jnpe.2022.S1.0044 |
[1] |
蒲晓彬, 马骏, 谢睿, 等. 主控室盘台整改可行性报告[Z]. 杭州: 中核核电运行管理有限公司, 2015.
|
[2] |
周玲, 熊彦, 刘艳阳, 等. 核电厂控制室设计: GB/T 13630-2015[Z]. 北京: 中国标准出版社, 2015.
|
[3] |
O’HARA J M, HIGGINS J C, FLEGER S A, et al. Human-system interface design review guidelines, NUREG-0700[R]. Washington: NRC, 2002.
|
[4] |
O’HARA J M, HIGGINS J C, FLEGER S A, et al. Human factors engineering program review model, NUREG-0711[R]. Washington: NRC, 2012.
|