Guo Xiaoxian, Gu Jipin, Zhu Hao, Liu Yang, Li Taifeng, Zhang Hu. Study on the Operation Characteristics of the Primary Main Circulating Pump of Sodium-cooled Fast Reactor under the Switching Condition of Off-site Main and Auxiliary Power Supplies[J]. Nuclear Power Engineering, 2023, 44(1): 104-108. doi: 10.13832/j.jnpe.2023.01.0104
Citation: Guo Xiaoxian, Gu Jipin, Zhu Hao, Liu Yang, Li Taifeng, Zhang Hu. Study on the Operation Characteristics of the Primary Main Circulating Pump of Sodium-cooled Fast Reactor under the Switching Condition of Off-site Main and Auxiliary Power Supplies[J]. Nuclear Power Engineering, 2023, 44(1): 104-108. doi: 10.13832/j.jnpe.2023.01.0104

Study on the Operation Characteristics of the Primary Main Circulating Pump of Sodium-cooled Fast Reactor under the Switching Condition of Off-site Main and Auxiliary Power Supplies

doi: 10.13832/j.jnpe.2023.01.0104
  • Received Date: 2022-03-21
  • Rev Recd Date: 2022-10-21
  • Publish Date: 2023-02-15
  • In order to avoid reactor protection shutdown or motor auxiliary winding startup due to the operation of primary main circulating pump (hereinafter referred to as main pump) during the off-site main and auxiliary power supplies switching, the idling characteristics and speed control of main pump are analyzed, the fast speed tracking and frequency search speed tracking modes of the main pump under fast and slow switching conditions are studied respectively, and the prediction model of the minimum speed of the main pump under different modes is given. It is analyzed that the minimum speed of main pump is 708.3 r/min under fast switching condition (power off for 1.5 s) and 341.2 r/min under slow switching condition (power off for 10 s). On the main pump water bench, 1.5 s and 10 s power off tests are used to simulate the fast switching and slow switching conditions of the off-site main and auxiliary power supplies. The test results show that the minimum speed of main pump is 689 r/min under fast switching condition; The minimum speed of main pump under slow switching condition is 346.7 r/min. The predicted minimum speed is in good agreement with the test value, and the deviation is less than 3%.The test verifies the operation characteristics of the main pump under the switching condition of the main and auxiliary power supplies, which can realize that the fast switching does not lead to the reactor protection shutdown and the slow switching does not lead to the startup of the auxiliary winding, which is of guiding significance for the safe operation of the reactor.

     

  • loading
  • [1]
    冉慧敏. 核电厂电源系统高可靠性的实现[J]. 电气应用,2006(3): 22-25.
    [2]
    王振营,郑文波,李红林,等. 岭澳核电站二期失电故障分析综述[J]. 核动力工程,2011, 32(S2): 51-57.
    [3]
    白德芳,李凯. 高压变频器“飞车启动”功能的实现[J]. 变频器世界,2007(4): 74-79.
    [4]
    尹彭飞,周加胜. 高压变频器的“飞车启动”及“星点漂移”功能[J]. 变频器世界,2008(5): 63-66,85.
    [5]
    李自先, 周中方, 张相胜. 变频器应用维护与修理[M]. 北京: 地震出版社, 2005: 60-65.
    [6]
    金毅,钟建兵. AP1000屏蔽式主泵的供电及变频器特点[J]. 核电工程与技术,2009(4): 1-8.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(10)

    Article Metrics

    Article views (186) PDF downloads(30) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return