Advance Search
Volume 40 Issue 5
Oct.  2019
Turn off MathJax
Article Contents
Li Changzheng, Lin Shaofang, Liu Weichao, Cai Zhiyi, Nie Lihong, Deng Yongjun. Optimization of Power Ramp Rate in CPR1000 Reactor Restarting[J]. Nuclear Power Engineering, 2019, 40(5): 74-78.
Citation: Li Changzheng, Lin Shaofang, Liu Weichao, Cai Zhiyi, Nie Lihong, Deng Yongjun. Optimization of Power Ramp Rate in CPR1000 Reactor Restarting[J]. Nuclear Power Engineering, 2019, 40(5): 74-78.

Optimization of Power Ramp Rate in CPR1000 Reactor Restarting

  • Publish Date: 2019-10-15
  • Restart strategy applied in CPR1000 units can be further improved according to the operation experience and the simulation conducted by software. This paper simulates the restarting and full power operating modes of the reactor in terms of ramp rate and Tthreshold power level. Conditioning occurs after tens of hours of operation at full power. The capacity factor can be increased about 0.1% by optimizing the ramp rate.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (353) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return