Advance Search
Volume 41 Issue 4
Aug.  2020
Turn off MathJax
Article Contents
Ma Rubing, Sheng Tianyou, Yuan Yidan, Ma Weimin. Study on Passive IVR Strategy Based on Steam Turbine[J]. Nuclear Power Engineering, 2020, 41(4): 41-44.
Citation: Ma Rubing, Sheng Tianyou, Yuan Yidan, Ma Weimin. Study on Passive IVR Strategy Based on Steam Turbine[J]. Nuclear Power Engineering, 2020, 41(4): 41-44.

Study on Passive IVR Strategy Based on Steam Turbine

  • Publish Date: 2020-08-15
  • In some NPPs with reactor pressure vessel (RPV) arranged at upper elevation, the water overflowing the cavity and/or condensed in the containment cannot flow back to the cavity only relying on the gravity during the IVR process, and so these NPPs cannot realize passive IVR in long term. To solve this problem, a new passive IVR strategy is put forward. In this strategy, the steam produced in the IVR is used to drive a steam turbine, and a pump is driven by the steam turbine to pump the water in the bottom of containment to the cavity again, to establish the cycle of steam and water and to realize the long term IVR. Detailed thermal hydraulic computation is carried out and the feasibility of the system is proved in this paper.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (292) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return