Yang Qingyun, Wu Yong, Liu Xianwen. Quality Control for On-Site Welding of Self-Cleaning Type RCP Canopy Seals in AP1000 Nuclear Power Plant[J]. Nuclear Power Engineering, 2014, 35(S1): 181-185.
Citation: Yang Qingyun, Wu Yong, Liu Xianwen. Quality Control for On-Site Welding of Self-Cleaning Type RCP Canopy Seals in AP1000 Nuclear Power Plant[J]. Nuclear Power Engineering, 2014, 35(S1): 181-185.

Quality Control for On-Site Welding of Self-Cleaning Type RCP Canopy Seals in AP1000 Nuclear Power Plant

  • Received Date: 2013-12-12
  • Rev Recd Date: 2014-03-20
  • Available Online: 2025-02-15
  • AP1000 reactor coolant pump uses the shielding pump with high inertia flywheel,and its cleaning,lubrication,sealing and cooling function are realized by auxiliary impeller to circulate the cooling water.No repair is required in the design life of 60 years.Canopy seals weld,as the RCP installation welds between the moving parts and the pump shell,acts as the seal of the internal circulating cooling water of the RCP.The Canopy seals qualification of welding procedure,type tests,and welding process control of site installation,nondestructive testing of quality control are discussed,in order to ensure the safety,quality and progress of AP1000 RCP installation welding on site.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (28) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return