Advance Search
Volume 34 Issue S2
Mar.  2025
Turn off MathJax
Article Contents
YANG Liping. Research and Application of Module Parameters of Half-speed Turbine Speed Governing System in CPR Nuclear Power Plant[J]. Nuclear Power Engineering, 2013, 34(S2): 87-89,96.
Citation: YANG Liping. Research and Application of Module Parameters of Half-speed Turbine Speed Governing System in CPR Nuclear Power Plant[J]. Nuclear Power Engineering, 2013, 34(S2): 87-89,96.

Research and Application of Module Parameters of Half-speed Turbine Speed Governing System in CPR Nuclear Power Plant

  • Received Date: 2012-10-09
  • Rev Recd Date: 2013-10-08
  • Available Online: 2025-03-08
  • CPR1000+ technology is applied into Ling’ao Phase Ⅱ1000MW-class nuclear power plant for the first time in China. It is important of security and steady operation for nuclear power plants and grid to get the module parameters of turbine governing system by the simulation tests. Characteristics of ALSTOM half-speed turbine governing system are analyzed. Simulation test of half-speed turbine governing system is put forward. Results of simulation are analyzed and the parameters are identified. Module parameters of ALSTOM half-speed turbine governing system are acquired. It is highly important for Ling’ao Phase and Ⅱ CPR nuclear power plants to ensure safe and steady operation of long-term.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (18) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return