Taking the phenomena of CPR1000 nuclear power plant steam inlet isolating valve of ASG TDFP fail to open as an example, combined with on-site commissioning process, this paper analyzed the fault causes base on the stress analysis and the work environment of the valve, and proposed the simple processing methods in the commissioning process and the reconstruction of the valve when nuclear power plants in service.