Advance Search
Volume 35 Issue S1
Feb.  2025
Turn off MathJax
Article Contents
Zhang Shuxing, Cao Yu. Research and Design of Mobile Electricity Generators Added for CPR1000 NPP Station Blackout[J]. Nuclear Power Engineering, 2014, 35(S1): 15-17.
Citation: Zhang Shuxing, Cao Yu. Research and Design of Mobile Electricity Generators Added for CPR1000 NPP Station Blackout[J]. Nuclear Power Engineering, 2014, 35(S1): 15-17.

Research and Design of Mobile Electricity Generators Added for CPR1000 NPP Station Blackout

  • Received Date: 2013-12-25
  • Rev Recd Date: 2014-03-02
  • Available Online: 2025-02-15
  • Long-drawn station blackout may occur from the Fukushima nuclear accident experience feedback,so it is necessary to add mobile electricity generators for NPP.This paper firstly analyzes CPR1000 NPP’s power configuration,then discusses the station blackout risk due to extreme natural disasters from the Fukushima nuclear accident experience feedback,whereafter fixes the functional orientation and essential loads of the mobile electricity generators,and then determines the reasonable power.This paper also describes the classification,advantages and disadvantages of mobile electricity generators,and recommends the appropriate type of power according to the specific needs of the NPP.Finally,it points out the key elements and advices for the design of mobile electricity generators.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (26) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return