Advance Search
Volume 33 Issue 3
Mar.  2025
Turn off MathJax
Article Contents
ZHAO Bo, LI Xiaoming, LI Lin. Probabilistic Safety Assessment to 1000 MW PWR Plant during Shutdown State[J]. Nuclear Power Engineering, 2012, 33(3): 74-78.
Citation: ZHAO Bo, LI Xiaoming, LI Lin. Probabilistic Safety Assessment to 1000 MW PWR Plant during Shutdown State[J]. Nuclear Power Engineering, 2012, 33(3): 74-78.

Probabilistic Safety Assessment to 1000 MW PWR Plant during Shutdown State

  • Received Date: 2011-02-25
  • Rev Recd Date: 2011-12-23
  • Available Online: 2025-03-08
  • This paper initiates a study focused on level 1 Probability Safety Assessment(PSA) for shutdown operation at 1000MWe PWR.Shutdown PSA models considering different plant outage types are constructed respectively to evaluate the risk of LOI-RRA operation.The application of SPAR-H method is also evaluated.The results show that the potential risk during shutdown should not be ignored;PSA for shutdown states could help to prompt the improvement in procedure to reduce the risk in shutdown condition.Going through the LOI-RRA operation at cool shutdown refueling outage significantly increases the plant risk;the dominant factor contributing to CDF is human error.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (17) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return