Power Up-rates Analysis of 310 MW Unit in Qinshan NPP
-
摘要: 基于现有设备的潜力,分析论证秦山核电厂310 MW核电机组提升功率的技术路线,对可能影响机组功率提升的问题进行研究,提出机组功率提升方案并进行试验验证。根据试验验证结果,对机组一、二回路参数匹配进行分析、调整和优化,最终确定功率提升方案和机组功率提升水平。Abstract: The power up-rates analysis of 310MW unit in Qinshan NPP is based on the main equipment potential. The preliminary power for up-rates is defined and the problems which affect the up-rates are identified through theory analysis. The tests are performed according to the theory analysis. The parameters of primary loop and second loop are adjusted. The final power rating is confirmed on the basis of tests.
-
计量
- 文章访问数: 10
- HTML全文浏览量: 4
- PDF下载量: 0
- 被引次数: 0