Schedule Management of Nuclear Island Design of First Kind of AP1000 Unit
-
摘要: 基于美国先进非能动压水堆(AP1000)首堆进度管理特点,阐述在复杂合同关系下,围绕AP1000首次设计、主要设备首次制造,以及模块化施工等首堆设计特点中遇到的主要问题。结合三门核电工程建设实际情况,探讨和分析AP1000首堆核岛设计对计划管理带来的主要挑战和困难,采取了一系列有效的应对措施,最大程度降低首堆设计对进度的影响,并结合三门核电建设经验和教训,提出了后续AP1000核电进度管理的建议。Abstract: Based on the schedule management for the first reactor of advanced passive pressurized water reactor(AP1000), this paper states the major problems under the complicated contractual relationships, focusing on the design of first reactor and the first-time manufacture of primary equipment as well as the modular construction, combined with the actual situation of Sanmen nuclear power project construction, and discusses and analyzes the major challenges and difficulties that the first AP1000 nuclear island design imposed on the scheduling management. A series of countermeasures is taken to minimize the impact on schedule delay of the design of first reactor. It also intends to put forward, in view of the experience and lessons learned in Sanmen nuclear power project construction, some suggestions for the schedule management of the future AP1000 projects.
-
Key words:
- AP1000 /
- Module /
- Design of first reactor /
- Schedule management
-
计量
- 文章访问数: 19
- HTML全文浏览量: 8
- PDF下载量: 0
- 被引次数: 0