Analysis of Design Features for CEPR Unit Overhauling
-
摘要: 对第3代中国先进压水堆(CEPR)机组各种类型大修分布总体策略及CEPR机组各大修窗口主要操作所需工期进行分析,发现CEPR机组大修短工期的实现主要得益于新设计特点及新工具、新材料的应用。同时也指出:台山核电厂一期CEPR机组在短期内实现短大修可能面临的主要困难。Abstract: Analysis of the overall strategy for various overhauling of CEPR as well as the duration of the main activities in each overhauling window found that the new design features, and new tools and materials contributed to the short outage duration for CEPR unit overhauling. This paper points out the main difficulties faced by the short duration of overhauling for Taishan CEPR units.
-
Key words:
- CEPR /
- Pressurized water reactor /
- Overhauling
-