Citation: | Wang Yiming, Gu Xiaohui, Li Youyi, Ma Chao, Deng Wei. Risk-Informed Analysis of Nuclear Power Plant Emergency Diesel Generator Returning to Factory for Overhaul[J]. Nuclear Power Engineering, 2021, 42(6): 225-229. doi: 10.13832/j.jnpe.2021.06.0225 |
[1] |
余红星,武铃珺,邓纯锐,等. 概率安全评价在核能安全分析领域的应用和发展[J]. 核动力工程,2020, 41(6): 1-7.
|
[2] |
Nuclear Regulatory Commission. An approach for using probabilistic risk assessment in risk-informed decisions on plant-specific changes to the Licensing Basis: Regulatory Guide (RG) 1.174[R]. USA: NRC, 1998
|
[3] |
Nuclear Regulatory Commission. An approach for plant-specific, risk-informed decisionmaking: technical specifications: Regulatory Guide (RG) 1.177[R]. USA:NRC, 1998
|
[4] |
国家核安全局. 概率风险评价用于特定电厂许可证基础变更的风险指引决策方法: NNSA-0147[R]. 北京: 国家核安全局, 2012: 33
|
[5] |
国家核安全局. 特定电厂风险指引决策方法: 技术规格书: NNSA-0148[R]. 北京: 国家核安全局, 2012: 34
|
[6] |
孙峰平. 田湾核电站1、2号机组技术规格书[Z]. 连云港: 中核集团江苏核电有限公司, 2018: 1
|