Advance Search
Volume 43 Issue 4
Aug.  2022
Turn off MathJax
Article Contents
Zhou Lusheng, Wang Liren, Liu Yizhou, Chen Junrong. Development of In-Service Inspection System for Flange Bolts of Reactor Coolant Pump in AP1000 Nuclear Power Plant[J]. Nuclear Power Engineering, 2022, 43(4): 162-167. doi: 10.13832/j.jnpe.2022.04.0162
Citation: Zhou Lusheng, Wang Liren, Liu Yizhou, Chen Junrong. Development of In-Service Inspection System for Flange Bolts of Reactor Coolant Pump in AP1000 Nuclear Power Plant[J]. Nuclear Power Engineering, 2022, 43(4): 162-167. doi: 10.13832/j.jnpe.2022.04.0162

Development of In-Service Inspection System for Flange Bolts of Reactor Coolant Pump in AP1000 Nuclear Power Plant

doi: 10.13832/j.jnpe.2022.04.0162
  • Received Date: 2021-05-12
  • Rev Recd Date: 2022-06-08
  • Publish Date: 2022-08-04
  • The flange bolts in-service inspection of reactor coolant pump in AP1000 Nuclear Power Plant is one of important supervision items. At present, there is no in-service inspection system and application case in China for this component. Combined with the structural characteristics of AP1000 reactor coolant pump flange bolts, the analysis of on-site high-dose environment and complex inspection conditions, this paper designs and develops a set of in-service ultrasonic inspection system for reactor coolant pump flange bolts, which implements ultrasonic inspection from the inner wall of the bolt center hole and is suitable for in-service inspection requirements. The debugging and test results on the simulation body of the reactor coolant pump show that the system can realize the functions of circumferential operation, vertical obstacle avoidance, precise alignment adjustment between the special ultrasonic probe and the bolt hole, etc., and then realize the ultrasonic scanning of the reactor coolant pump flange bolts. The engineering application results show that the system meets the requirements of in-service inspection of flange bolts of reactor coolant pump in AP1000 Nuclear Power Plant, and has high reliability and good applicability.

     

  • loading
  • [1]
    林诚格, 郁祖盛, 欧阳予. 非能动安全先进压水堆核电技术[M]. 北京: 中国原子能出版社, 2010: 82-83.
    [2]
    张明乾,刘昱,李承梁. 浅谈压水堆核电站AP1000屏蔽式电动主泵[J]. 水泵技术,2008(4): 1-5.
    [3]
    张宝军,张国丰,严智,等. 核电厂主螺栓超声自动检测技术研究与实现[J]. 压力容器,2013, 30(5): 64-69. doi: 10.3969/j.issn.1001-4837.2013.05.012
    [4]
    美国机械工程师协会( ASME ), 美国国家标准协会(ANSI). ASME锅炉及压力容器规范 第Ⅺ卷 核电厂部件在役检查规则: ASME BPVC Ⅺ —2007[S]. 北京: 中国石化出版社, 1998.
    [5]
    陶泽勇,赵琛,周路生,等. 核电站主泵法兰连接螺栓超声检测控制系统设计[J]. 制造业自动化,2019, 41(9): 1-4. doi: 10.3969/j.issn.1009-0134.2019.09.001
    [6]
    陶泽勇,刘震,周路生,等. 基于Galil卡的管道扫查器控制设计[J]. 制造业自动化,2015, 37(23): 108-109. doi: 10.3969/j.issn.1009-0134.2015.23.32
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(5)  / Tables(5)

    Article Metrics

    Article views (251) PDF downloads(41) Cited by()