Advance Search
Volume 43 Issue 6
Dec.  2022
Turn off MathJax
Article Contents
Xing Ji, Shi Xueyao, Huang Shuming. Discuss on Off-site Consequence Evaluation Criteria after Severe Accident for Zhangzhou NPP[J]. Nuclear Power Engineering, 2022, 43(6): 122-127. doi: 10.13832/j.jnpe.2022.06.0122
Citation: Xing Ji, Shi Xueyao, Huang Shuming. Discuss on Off-site Consequence Evaluation Criteria after Severe Accident for Zhangzhou NPP[J]. Nuclear Power Engineering, 2022, 43(6): 122-127. doi: 10.13832/j.jnpe.2022.06.0122

Discuss on Off-site Consequence Evaluation Criteria after Severe Accident for Zhangzhou NPP

doi: 10.13832/j.jnpe.2022.06.0122
  • Received Date: 2021-12-29
  • Rev Recd Date: 2022-09-26
  • Publish Date: 2022-12-14
  • In order to quantitatively evaluate the basic objective of “offsite protective actions that can reduce the radiological consequences technically are limited or even can be cancelled”, this paper proposes the design objective of “no evacuation is required beyond 3 km, no concealment and iodine taking are required beyond 5 km” after severe accidents from the perspective of simplifying off-site emergency after accidents. Combined with the site conditions of Zhangzhou NPP, a set of radioactive consequence evaluation criteria for Zhangzhou NPP are derived. Through the analysis of the typical severe accident process and radioactive release process of HPR1000, the results show that the HPR1000 reactor type of Zhangzhou NPP meets the radiological consequence evaluation criteria proposed in this paper, and can achieve the goal of “no evacuation is required beyond 3 km, no concealment and iodine taking are required beyond 5 km” after a severe accident.

     

  • loading
  • [1]
    邢继. 世界三次严重核事故始末[M]. 北京: 科学出版社, 2019: 15-30.
    [2]
    IAEA. The Fukushima Daiichi accident-report by the director general[Z]. Vienna: IAEA, 2015.
    [3]
    邢继,魏玮,刘静,等. 核电厂设计上实现实际消除论证方法研究[J]. 原子能科学技术,2022, 56(1): 1-8.
    [4]
    IAEA. Deterministic safety analysis for nuclear power plant: No. SSG-2 (Rev. 1) [R]. Vienna: IAEA, 2019.
    [5]
    IAEA. Safety of nuclear power plant: Design: No. SSR-2/1 (Rev. 1)[R]. Vienna: IAEA, 2016.
    [6]
    US. NRC. Safety goals for the operation of nuclear power plants: NUREG-0880[R]. Washington: NRC, 1986
    [7]
    EPRI. Advanced light water reactor utility requirements document, Volume III ALWR passive plant[Z]. 8th ed. Palo Alto: EPRI, 1999.
    [8]
    EUR. European utility requirements for LWR nuclear power plant, Rev D[Z]. EUR: Lyon, 2012.
    [9]
    林诚格, 史国宝, 陈耀东, 等. 对“实际消除核电厂大量放射性物质释放”的技术见解[J]. 核科学与工程, 2013, 33(4): 337-345
    [10]
    陈晓秋,李冰,林权益. 对AP1000核电厂简化应急计划的探讨[J]. 辐射防护,2008, 28(4): 244-249.
    [11]
    林继铭, 贺东钰, 崔赫辰, 等. “实际消除核电厂大量放射性物质释放”解读[C]//“从设计上实际消除核电厂大量放射性物质释放”研讨会论文集. 北京: 中国核学会, 2015.
    [12]
    中华人民共和国国家质量监督检验检疫总局. 电离辐射防护与辐射源安全基本标准: GB 18871—2002[S]. 北京: 中国标准出版社, 2004: 182-183.
    [13]
    HENRY R E, PAIK C Y, PLYS M G. MAAP4 – modular accident analysis program for LWR power plant - code structure and theory, computer code manual[R]. Burr Ridge, Illinois: Fauske & Associates Inc., 1994
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Tables(5)

    Article Metrics

    Article views (248) PDF downloads(40) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return