Advance Search
Volume 43 Issue 6
Dec.  2022
Turn off MathJax
Article Contents
He Feng, Wu Wanjun, Ma Ruoqun, Fang Yonggang, Ai Honglei, Wang Xinjun, Sun Yingxue. Verification and Research of LBB Pipe Crack Leakage Rate Calculation Software PICLES[J]. Nuclear Power Engineering, 2022, 43(6): 168-173. doi: 10.13832/j.jnpe.2022.06.0168
Citation: He Feng, Wu Wanjun, Ma Ruoqun, Fang Yonggang, Ai Honglei, Wang Xinjun, Sun Yingxue. Verification and Research of LBB Pipe Crack Leakage Rate Calculation Software PICLES[J]. Nuclear Power Engineering, 2022, 43(6): 168-173. doi: 10.13832/j.jnpe.2022.06.0168

Verification and Research of LBB Pipe Crack Leakage Rate Calculation Software PICLES

doi: 10.13832/j.jnpe.2022.06.0168
  • Received Date: 2021-11-16
  • Accepted Date: 2022-02-14
  • Rev Recd Date: 2022-02-01
  • Publish Date: 2022-12-14
  • The calculation of pipe crack leakage rate is the key technology in leak-before-break (LBB) analysis. By comparing with the effective software and the experimental results, the domestic independently developed leakage rate calculation software PICLES is verified and studied. Compared with the international similar software (PICEP and SI-PICEP) with mature engineering applications, there is a small difference between PICLES and its calculation results. Compared with the experimental results of pipe crack leakage rate, the leakage rate calculated by PICLES is −80.23%~−43.79% different from that calculated by PICLES, and the leakage crack length calculated by PICLES is 21.84%~79.07% different from the measured crack length, which shows that the LBB analysis of supercooled water pipeline using PICLES is highly conservative. Therefore, PICLES can be used for LBB analysis in practical projects.

     

  • loading
  • [1]
    周胜,张征明. 破前漏分析中泄漏率模型研究进展[J]. 原子能科学技术,2009, 43(S1): 84-91.
    [2]
    NORRIS D M, CHEXAL B. PICEP: pipe crack evaluation program (Revision 1): special report: EPRI-NP-3596-SR-Rev. 1[R]. Palo Alto: EPRI, 1987.
    [3]
    PAUL D D, AHMAD J, SCOTT P M, et al. Evaluation and refinement of leak-rate estimation models: NUREG/CR-5128[R]. Washington: Nuclear Regulatory Commission, 1991.
    [4]
    吴万军,谢海,兰彬,等. 管道裂纹泄漏率计算软件开发[J]. 核动力工程,2015, 36(4): 65-68. doi: 10.13832/j.jnpe.2015.04.0065
    [5]
    彭常宏,郭赟,李浩,等. 管道穿透裂纹泄漏率计算程序[J]. 核动力工程,2003, 24(6): 505-507,554. doi: 10.3969/j.issn.0258-0926.2003.06.003
    [6]
    U. S. Nuclear Regulatory Commission. Standard review plan 3.9. 1 special topics for mechanical components: NUREG-0800[S]. Washington: U. S. Nuclear Regulatory Commission, 2007.
    [7]
    U. S. Nuclear Regulatory Commission. Evaluation of potential for pipe breaks: NUREG-1061[S]. Washington: U. S. Nuclear Regulatory Commission, 1984.
    [8]
    U. S. Nuclear Regulatory Commission. Standard review plan 3.6. 3 Leak-before-break evaluation procedures: NUREG-0800[S]. Washington: U. S. Nuclear Regulatory Commission, 2007.
    [9]
    吴万军,黄旋,沈平川. 管道裂纹泄漏率计算方法研究[J]. 核动力工程,2015, 36(S2): 122-126. doi: 10.13832/j.jnpe.2015.S2.0122
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(4)  / Tables(5)

    Article Metrics

    Article views (194) PDF downloads(25) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return