Advance Search
Volume 33 Issue 4
Mar.  2025
Turn off MathJax
Article Contents
LI Tianjin, CHEN Feng, HE Xuedong, CHEN Wensheng, SUN Bo, HUANG Zhiyong. Experimental Study on Absorption Spheres Pile after the Interruption and Restart of Pneumatic Conveying[J]. Nuclear Power Engineering, 2012, 33(4): 54-57.
Citation: LI Tianjin, CHEN Feng, HE Xuedong, CHEN Wensheng, SUN Bo, HUANG Zhiyong. Experimental Study on Absorption Spheres Pile after the Interruption and Restart of Pneumatic Conveying[J]. Nuclear Power Engineering, 2012, 33(4): 54-57.

Experimental Study on Absorption Spheres Pile after the Interruption and Restart of Pneumatic Conveying

  • Received Date: 2011-04-25
  • Rev Recd Date: 2011-10-25
  • Available Online: 2025-03-08
  • The experiments were conducted in a positive pressure system to investigate the absorption spheres pile after the pneumatic conveying interruption and the restart characteristics.The ambient air was used as the source gas.The absorption spheres were replaced by the glass spheres.The average pile height in the conveying pipe of the experiment system was 1172 mm,which was ~11% of the transport pipe height,as the pneumatic conveying interruption happened at the steady state stage.The continuing spheres supply from the feeder during the blower flow rate decreasing process should be the main factor for the pile up amount of spheres in the conveying pipe.The spheres amount in the steady state conveying line was only ~10% of the pile amount.The maximum and steady state pressure drop of the gas-solid conveying line in the restart process were approximately equal to those of the normal start process.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (13) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return