Advance Search
Volume 34 Issue 5
Mar.  2025
Turn off MathJax
Article Contents
SUN Hai-tao, ZHANG Yue, WANG Chen, SHENG Chao-yang, JIA Pan-pan. Discussion on Operation Occasion of Pre-Service Inspection and Main Primary System Hydrostatic Test of PWR[J]. Nuclear Power Engineering, 2013, 34(5): 135-138.
Citation: SUN Hai-tao, ZHANG Yue, WANG Chen, SHENG Chao-yang, JIA Pan-pan. Discussion on Operation Occasion of Pre-Service Inspection and Main Primary System Hydrostatic Test of PWR[J]. Nuclear Power Engineering, 2013, 34(5): 135-138.

Discussion on Operation Occasion of Pre-Service Inspection and Main Primary System Hydrostatic Test of PWR

  • Received Date: 2013-05-23
  • Rev Recd Date: 2013-07-22
  • Available Online: 2025-03-08
  • By comprehensive analysis of Guide 103/07 of Nuclear Safety of the People’s Republic of China(HAD 103/07),In-Service Inspection Rules for the Mechanical Components of PWR Nuclear Islands(RSE-M),Section XI of American Society of Mechanical Engineers Boiler and Pressure Vessel Code(ASME)and French 1999 decree about in-service supervision items for main primary and second loops of PWR Nuclear Plant,and etc,as well as combined with the present domestic engineering practice in pre-service inspection,besides the analysis of the affects respectively caused by that pre-service inspection executes before hydrostatic test and hydrostatic test executes before pre-service inspection,technique views were formed for operation occasion between pre-service inspection and hydrostatic test for main primary system.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (38) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return