This paper introduces the function,the operation condition and the system setting of the habitability air-conditioning system of main control room for China Advanced Research Reactor,and analyzes the cooling load computing of the main control room.The result shows that this air-conditioning system can not only meet the requirements on temperature and humidity in the main control room under the normal operation conditions,but also the requirements on the habitability for the operators under the accident conditions.