Advance Search
Volume 30 Issue S2
Dec.  2009
Turn off MathJax
Article Contents
GUO De-peng, WANG Yong-jiao. Optimization of Management and Implementation on Nuclear Equipment Quality Surveillance Work[J]. Nuclear Power Engineering, 2009, 30(S2): 75-78,87.
Citation: GUO De-peng, WANG Yong-jiao. Optimization of Management and Implementation on Nuclear Equipment Quality Surveillance Work[J]. Nuclear Power Engineering, 2009, 30(S2): 75-78,87.

Optimization of Management and Implementation on Nuclear Equipment Quality Surveillance Work

  • Received Date: 2009-10-20
  • Rev Recd Date: 2009-12-06
  • Available Online: 2025-07-28
  • Nuclear equipment manufacturing quality surveillance is an important part of the quality management work in the nuclear power plant construction. China Nuclear Power Engineering Co. LTD optimizes the management and implementation of surveillance work based on the cooperation with other top-ranking surveillance teams and the experience of nuclear power stations, such as Daya Bay and Ling’ao Nuclear Power Projects. The optimization effect can be showed as following items: the organization acclimatizes itself to the need of project; the surveillance doctrine becomes more clear, and the surveillance management becomes intensive from extensive.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (8) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return