Advance Search
Volume 35 Issue 3
Feb.  2025
Turn off MathJax
Article Contents
Wang Guoxian, Ren Hongbing, Zuo Chaoping, Zhu Yong, MO Shaojia. Design Optimization on Structure of Blowdown in CPR1000 Steam Generator[J]. Nuclear Power Engineering, 2014, 35(3): 64-68. doi: 10.13832/j.jnpe.2014.03.0064
Citation: Wang Guoxian, Ren Hongbing, Zuo Chaoping, Zhu Yong, MO Shaojia. Design Optimization on Structure of Blowdown in CPR1000 Steam Generator[J]. Nuclear Power Engineering, 2014, 35(3): 64-68. doi: 10.13832/j.jnpe.2014.03.0064

Design Optimization on Structure of Blowdown in CPR1000 Steam Generator

doi: 10.13832/j.jnpe.2014.03.0064
  • Received Date: 2013-12-29
  • Rev Recd Date: 2014-02-24
  • Available Online: 2025-02-15
  • The structure of blowdown in CPR1000 steam generator has been optimized by eliminating the blowdown pipe and tube lane blocking, drilling holes in the peripheral tube lane, which can improve the accessibility of the central tube lane and facilitate inspecting and lancing. This paper detailed compares and analyzes the thermal hydraulic characteristic before and after optimization using GENEPI code which a special software for SG thermal hydraulic analysis. The results showed that the thermal hydraulic characteristic of steam generator meets the design requirements compared with the original design. Structure optimization can improve lancing effects, although the change of flow field distribution above the tubesheet leads to increase the number of tube subjected to sludge deposit. The analysis results proved the feasibility of the optimization.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (19) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return