The structure of blowdown in CPR1000 steam generator has been optimized by eliminating the blowdown pipe and tube lane blocking, drilling holes in the peripheral tube lane, which can improve the accessibility of the central tube lane and facilitate inspecting and lancing. This paper detailed compares and analyzes the thermal hydraulic characteristic before and after optimization using GENEPI code which a special software for SG thermal hydraulic analysis. The results showed that the thermal hydraulic characteristic of steam generator meets the design requirements compared with the original design. Structure optimization can improve lancing effects, although the change of flow field distribution above the tubesheet leads to increase the number of tube subjected to sludge deposit. The analysis results proved the feasibility of the optimization.