Advance Search
Volume 29 Issue S1
Jun.  2008
Turn off MathJax
Article Contents
ZENG Jing, LI Xing-yuan, ZHANG Ting-sheng. Issues Ignored in Laboratory Quality Surveillance[J]. Nuclear Power Engineering, 2008, 29(S1): 53-55.
Citation: ZENG Jing, LI Xing-yuan, ZHANG Ting-sheng. Issues Ignored in Laboratory Quality Surveillance[J]. Nuclear Power Engineering, 2008, 29(S1): 53-55.

Issues Ignored in Laboratory Quality Surveillance

  • Received Date: 2008-05-20
  • Rev Recd Date: 2008-06-26
  • Available Online: 2025-07-22
  • According to the work requirement of the related laboratory quality surveillance in ISO17025, this paper analyzed and discussed the issued ignored in the laboratory quality surveillance. In order to solve the present problem, it is required to understand the work responsibility in the quality surveillance correctly, to establish the effective working routine in the quality surveillance, and to conduct, the quality surveillance work. The object in the quality surveillance shall be "the operator" who engaged in the examination/calibration directly in the laboratory, especially the personnel in training (who is engaged in the examination/calibration). The quality supervisors shall be fully authorized, so that they can correctly understand the work responsibility in quality surveillance, and are with the rights for "full supervision". The laboratory also shall arrange necessary training to the quality supervisor, so that they can obtain sufficient guide in time and are with required qualification or occupation prerequisites.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (4) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return