The seismic capability walkdown is very important in the seismic margin assessment of nuclear power plants.This paper discussed the problem that the walkdown can solve directly.Also this paper described the flow of walkdown,including the seismic capability preparatory work and walkdown process,and described the walkdown guidelines for several kinds of equipment.Lastly,the author gave the envision of achieving the walkdown with high efficiency.